80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam

QINGDAO HONTED BUILDING MATERIALS CO.,LTD
  • Audited Supplier
  • 7 yrs

Contact Supplier

Still deciding? Get samples of $ !
Request Sample

Product Highlights

  • Customizable Specifications: Roll width, length, and color can be customized to customer requirements.
  • Alkali-Free Resistance: Made of E-Glass fiber with alkali-resistant emulsion coating for durability.
  • High Strength & Crack Resistance: Stable structure with excellent corrosion and crack resistance for walls.
  • Wide Application Range: Suitable for EPS foam, cement, stucco, EIFS, gypsum, and wooden floors.
  • 100% Quality Testing: Every product undergoes 100% testing before delivery to ensure quality.
  • Professional OEM Service: We can produce according to your samples or technical drawings.
  • Standard Roll Sizes: Available in 38'x150ft and 48'x150ft, with 15oz heavy duty options.
  • Efficient Delivery: General delivery time is 21 days after receiving advance payment.

Product Images of 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam

80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam pictures & photos
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam pictures & photos
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam pictures & photos
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam pictures & photos
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam pictures & photos
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam pictures & photos
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
  • 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
  • 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
    80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
  • 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
    80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
  • 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
    80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
  • 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
    80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
  • 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
    80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
  • 80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
    80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam

Find Similar Products

Product Description

Fiberglass mesh is made of glass fiber woven fabric and coated with alkali resistant emulsion. The product has the characteristics of stable structure, high strength, good alkali resistance, corrosion resistance, crack resistance, etc. with the best reforcement effect, simple construction and easy operation. It is a new type of building material for external wall insulation enginnering, which is mainly used for strengthening and crack preventation of internal and external surfaces of cement,stucco, eifs systems, gypsum, wall, buidings, wooden floors, stadium rubber ground and other structures.

In north America market, the standard fiberglass mesh is 4.5oz, the mesh should be very soft, easy to operation and not harm the hands. The standard roll size is 38" x 150ft and 48" x 150ft. The standard color is white, blue and yellow. For some villa project, some clients will choose 15oz heavy duty mesh.

4.5oz 38" x 150ft, 48"x 150ft, 

15oz 38"x 75ft

80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam


Specifications

Weight Yarn (tex) Mesh Size (mm) Density Count/25mm Tensile Strength x 20cm
(g/m2) Warp Weft Warp Weft Warp Weft Warp Weft
55 30 x 2 45 2.5 2.5 10 10 450 450
55 30 x 2 67 2.82 2.82 9 9 150 450
60 30 x 2 67 2.5 2.5 10 10 500 650
65 30 x 2 100 2.82 2.82 9 9 450 650
70 45 x 2 200 5 5 5 5 550 850
75 45 x 2 200 4 5 6 5 600 650
80 67 x 2 200 5 5 5 5 700 850
90 67 x 2 250 5 5 5 5 700 1050
100 67 x 2 250 4 5 6 5 850 1000
110 100 x 2 250 5 5 5 5 800 1050
120 100 x 2 250 4 5 6 5 1000 1300
125 134 x 2 250 5 5 5 5 1200 1300
135 134 x 2 300 5 5 5 5 1300 1400
140 134 x 2 250 4 5 6 5 1300 1350
145 250 x 2 700 10 10 2.5 2.5 1250 1700
150 134 x 2 300 4 5 6 5 1300 1300
160 134 x 2 400 5 5 5 5 1450 1600
165 134 x 2 350 4 5 6 6 1300 1300
 
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
 
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
 


Packing and Shipping

4 Rolls / Box. 9 boxes / Pallet.
 

80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam

                            Paper Box                                                                              Pallet                                                                   Container loading

Application

80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam

FAQs

1. What is your terms of packing?
    Generally, we pack our goods in carton with pallet

2. What is your tems of payment?
    T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

3. What is your terms of delivery?

    EXW, FOB, CFR, CIF,L/C at sight

4. How about your delivery time?

    Generally, it will take 21 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

5. Can you produce according to the samples?
    
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

6. What is your sample policy?
    We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

7. Do you test all your good before delivery?
    Yes, we have 100% test before delivery

 
 
          24 Hours Services          
80GSM-160GSM 2.5oz-4.5oz Sticky Fiberglass Mesh for EPS Foam
Choose us, you will get the key of market!
Contact us, we will use the professional knowledge serve you!
Wish we can create the great future together!

 

About the Supplier

Watch Video
Watch Video
QINGDAO HONTED BUILDING MATERIALS CO.,LTD
QINGDAO HONTED BUILDING MATERIALS CO.,LTD
QINGDAO HONTED BUILDING MATERIALS CO.,LTD
QINGDAO HONTED BUILDING MATERIALS CO.,LTD
QINGDAO HONTED BUILDING MATERIALS CO.,LTD
QINGDAO HONTED BUILDING MATERIALS CO.,LTD
QINGDAO HONTED BUILDING MATERIALS CO.,LTD
QINGDAO HONTED BUILDING MATERIALS CO.,LTD

About Our Factory & Business Background

Address
No 510 Chongyang Road, Qingdao, Shandong, China
Terms of Payment
LC, T/T, PayPal, Western Union
International Commercial Terms(Incoterms)
FOB, CFR, CIF, EXW
Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Nearest Port
Qingdao, Shanghai, Lian Yungang

Our Production Capability & Technical Expertise

Main Products
Fiberglass Roving / Yarn, Fiberglass Fabric / High Silica Fabric, Fiberglass Chopped Strand Mat / Fiberglass Mat, Fiberglass Woven Roving, Fiberglass Tissue Veil / Pet Veil, Fiberglass Cloth / Glass Fiber Insulation, Fiberglass Mesh, Fiberglass Stitched Mat / Multiaxial Combo Mat, Natural Graphite Powder / Expandable Graphite, Chemicals / Fumed Silica / Sodium Methoxide

Our Industry Experience & Global Business Record

Export Year
2018-02-19
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is your terms of packing?
Generally, we pack our goods in carton with pallet
What is your tems of payment?
T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
What is your terms of delivery?
EXW, FOB, CFR, CIF,L/C at sight
How about your delivery time?
Generally, it will take 21 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Can you produce according to the samples?
Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
What is your sample policy?
We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Do you test all your good before delivery?
Yes, we have 100% test before delivery

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now